Photos of High Radiation Levels at Fukushima Daiichi

Author: No Comments Share:

TEPCO Status Update:

- At 2:30 pm on August 1, as radiation level of surface of connection of 
  emergency gas treatment system piping arrangement at the bottom of main 
  exhaust stuck of unit 1 and 2 was detected over 10 Sv/h, keep the area 
  out for restricted area with signature. We will consider countermeasure 
  such as shilding.


Previous Article

Fatal Radiation Levels Recorded for Second Day at Fukushima Daiichi

Next Article

TEPCO Says Lethal Radiation Sealed