Sent: Monday, March 21, 2011 3:17 PM
To: Santiago, Patricia; Chang, Richard; Wagner, Katie
Cc: Schaperow, Jason
Subject: Requests
Right now we have 2 actions we are following up
1. Clarification and assessment of potential radiological release source terms for Fukushima Units 3&4 spent fuel pools, earlier estimates were made based on earlier Peach Bottom analyses and followup is needed to address Fuskushima and complete dryout and concrete attack, clarification sought by the PMT
2. We have received additional requests from Naval Reactors. These are being put on hold. Discussed with Brian Sheron
Charles Tinkler
[email protected]
Related articles
- March 19th, 2011 – The NRC gave Michael Scott KI to go to Japan – He probably won’t each much in the way of green leafy veggies while over there. (enformable.com)
- March 17th 2011- All the Troublesome Reactor Venting and How to Prevent It (enformable.com)
- March 15th, 2011 – The Whole Spent Fuel Pool At Reactor 3 Could Boil Dry In 20 Days (enformable.com)
- March 16th 2011 – NRC Admits Zirc Fire Is Possible – But Won’t Release All the Research Data (enformable.com)
- March 18th, 2011 – There’s Got to be a ton of loose materials floating in the SFP – I would not be surprised if the top 10 feet or so of the sfp was sloshed out (enformable.com)
- March 18th 2011 – Consequences of criticality in one of the spent fuel pools not significant in comparison to consequences of sfp remaining empty (enformable.com)
- March 15th, 2011 – Fukushima Daiichi Units Degrading – Zirconium Fire at Reactor 4 SFP – Reactor 2 Possible Reactor Vessel Breach & Ex-Vessel Core Reaction (enformable.com)
- Fukushima Daiichi Unit 3 – 10 days after the earthquake disaster view on core re-melting (enformable.com)