Airborne Radiation Dose Measured at 1st floor of Fukushima Daiichi Unit 3

Author: No Comments Share:

Airborne Radiation Dose Measured by Robot at 1st floor of Reactor Buildings of Unit 3 at Fukushima Daiichi Nuclear Power Station

November 16, 2011
Tokyo Electric Power Company

Approx. 1,300mSv/h detected near the surface of the northern grooved rail when whether the water exists in the rail or not was being checked

Previous Article

March 18th, 2011 – Everyone in NRC is getting their emails FOIA’ed by AP – This should be fun

Next Article

March 18th, 2011 – NRC Systems Analyst – 3 reactors with exposed fuel SFP Questionable

Leave a Reply