May 25th, 2012 – FOIA Archive Release – Fukushima Daiichi – Cooling reactors through drywell – How much of Unit 2 core is still in RPV?

Author: No Comments Share:

Last Updated – 9:50 AM

A New Strategy for the Fukushima Daiichi Disaster

The Domino Theory (the Plausible Hypothetical Worst Case) is Not Any Longer Credibly Possible – Pages From ML12122A221

IAEA Activities in Response to TheFukushima Accident Report by the Director General

Science of Nuclear Safety Post-Fukushima

Nuclear Power in aPost-Fukushima World

Conditions of Fukush’Iima Dai-Ichi Nuclear Power Station Unit 1(as o6f 7 00 April 22nd, 2011) – Pages From ML12122A221-6

COMGBJ-11-0002 – NRC Actions Following the Events in Japan – Pages From ML12122A221-7

Evacuation of Workers Due to 100 R-Hr Fields at What Appears to Be the Unit 2 Turbine Hall – Pages From ML12122A221-2

Fukushima Exceeds Authority of Stafford Act – FEMA Not in Lead – Pages From ML12122A221-3

Meeting Agenda on Small Modular Reactors – Pages From ML12122A221-4

HHS State-Territory 2011 Pacific Basin Earthquake-Tsunami Conference Call – Pages From ML12122A221-5

White House Briefing Call – Pages From ML12122A221-6

Agenda for Industry Consortium Daily Call (NOTE TIME CHANGE to 2000 HRS DAILY) – Pages From ML12122A221-7

Japan Distribution List – Pages From ML12122A221-8

Meeting Minutes Form 4-1-11 2000 Industry Consortium Call – Pages From ML12122A221-9

FYI – You Might Have Seen Those High Resolution Images Already – Pages From ML12122A221-10

Commercial RADIACS From INPO – Pages From ML12122A221-11

Typical Reverse Osmosis Systems and Their Ability to Filter Outradionuclides – Pages From ML12122A221-3

REVISED – In Preparation for 2000 Hour NRC Consortium Call for Japan – Pages From ML12122A221-4

Cooling Fukushima Daiichi Reactors Through the Steel Head of the Drywell – Pages From ML12122A221-6

NRC Staff Speculates That Part of the Unit 2 Core May Be Out of the Reactor Pressure Vessel – Pages From ML12122A221-7

ML111940514 – Fukushima and the NRC’sResponseJuly July 13, 2011

BoilingWaterReactor(BWR)Systems

[adsense]

Perspectives of A Commissioner in Times of A Historical EventNRC Commissioner William C. OstendorffApril 13, 2011

FYI – Information From Video Conference on 4 5 11 That May Be of Interest to the Consortium – Pages From ML12122A221

4-6-11 0300 EDT Call With Site Team – Pages From ML12122A221-2

We Need to Get a Better Understanding of the AMS Data From DOE – Pages From ML12122A221-3

TEPCO Daily Update Thursday April 7 – Pages From ML12122A221-4

ML12143A336 – Filtered Containment Venting Systems Advisory Committee on Reactor Advisory Committee on Reactor Safeguards Safeguards May 22, 2012

Fukushima Daiichi Reactor Diagrams

Ml12144a058 – Resilient Control for Critical Infrastructures And Systems

Reliability Estimation for a Digital Instrument And Control System

Ml12144a045 – Regulatory Commitment Issues Licensing Action Task Force May 10, 2012

English Translation of Investigations on Long Term Behaviour of Lead and Lead Alloys

From “Shelter” to New Safe Confinement

Davis-Besse Nuclear Power Plant

Ml12052a179 – Summary of Telephone Conference Call Held on July 19, 2011,, Concerning Requests for Additional Information Pertaining to The Davis-Besse Nuclear Power Statio

San Onofre Nuclear Generating Station

LER 2012-002-00, Unit 3 Steam Generator Tube Degradation Indicated ByFailed in-Situ Pressure Testing San Onofre Nuclear Generating Station (SONGS), Unit 3

LER 2012-002-00, Emergency Diesel Generator Vibration Trip Not By Passed For Non-Accident Conditions San Onofre Nuclear Generating Station (SONGS), Units 2 and 3

2011 Annual Radio Logical Envi Ronmental Operating Repor tSan Onofre Nuclear Generating Station Uni Ts 1, 2 and 3 And Independent Spent Fuel Storage Faci l i Ty

 

Related Articles on Page 2…

[adsense]

Previous Article

Investigation underway after beer bottle found in protected area at Waterford 3

Next Article

Reporters without borders blasts TEPCO and Japan over unacceptable restrictions on freelance journalists

Leave a Reply