Supervisor at Harris Nuclear Power Plant fails for-cause chemical fitness for duty test

Author: No Comments Share:

Power Reactor Event Number: 48396
Facility: HARRIS
Region: 2 State: NC
Unit: [1] [ ] [ ]
RX Type: [1] W-3-LP
NRC Notified By: JOHN CAVES
HQ OPS Officer: DONG HWA PARK
Notification Date: 10/10/2012
Notification Time: 07:14 [ET]
Event Date: 10/09/2012
Event Time: 13:00 [EDT]
Last Update Date: 10/10/2012
Emergency Class: NON EMERGENCY
10 CFR Section:
26.719 – FITNESS FOR DUTY
Person (Organization):
DEBORAH SEYMOUR (R2DO)

Unit

SCRAM Code

RX CRIT

Initial PWR

Initial RX Mode

Current PWR

Current RX Mode

1

N

Y

100

Power Operation

100

Power Operation

POTENTIAL FITNESS FOR DUTY VIOLATION

A non-licensed employee supervisor was administered a for-cause chemical test. The employee’s access to the plant has been terminated. Contact the Headquarters Operations Officer for additional details.

The NRC Resident Inspector has been notified.

Source: NRC Event Notifications

Previous Article

Eight of the ‘Fukushima 50’ meet with Prime Minister Noda

Next Article

Toshiba shares fall after announcement of increased stake in nuclear industry