Crystal River Supervisor fails for cause fitness for duty test

Author: No Comments Share:
Power Reactor Event Number: 48476
Facility: CRYSTAL RIVER
Region: 2 State: FL
Unit: [3] [ ] [ ]
RX Type: [3] B&W-L-LP
NRC Notified By: WILLIAM KISNER
HQ OPS Officer: BILL HUFFMAN
Notification Date: 11/02/2012
Notification Time: 11:33 [ET]
Event Date: 11/01/2012
Event Time: 16:00 [EDT]
Last Update Date: 11/02/2012
Emergency Class: NON EMERGENCY
10 CFR Section:
26.719 – FITNESS FOR DUTY
Person (Organization):
GEORGE HOPPER (R2DO)
Unit SCRAM Code RX CRIT Initial PWR Initial RX Mode Current PWR Current RX Mode
3 N N 0 Defueled 0 Defueled
FITNESS FOR DUTY – CONTRACT SUPERVISOR CONFIRMED POSITIVE

A non-licensed contract supervisor had a confirmed positive ‘for cause’ fitness-for-duty test. The contractor’s access to the plant has been terminated. Contact the Headquarters Operations Officer for additional details.

The licensee has notified the NRC Resident Inspector.

Source: NRC Event Notifications

Previous Article

In-Focus: Japan – TEPCO denies deliberate attempt to cover up facts about worker exposure – Post-Fukushima survey shows shortage of evacuation sites

Next Article

In-Focus: Japan – More rice found contaminated – Two utilities consider rate increases