FOIA
SPEEDI 313

May 17th, 2012 FOIA Archive Release – RASCAL Estimations – SPEEDI Data – Communications – Status Updates

Last Updated 15:25  Main FOIA Archives   FOIA’s Related to Reactor Research/Data NRC RASCAL Estimations Unit 4 Case Summary One Batch – Pages From Pages From ML12123A057 -397 Pages 3 11 2011-12 Snl Zr Fire…

george_vassiliou

March 16th, 2011 – Merrill Lynch VP asks former USNRC director “What do you make of the Japanese reactor situation?”

Merril-Lynch Vice President George Vassiliou is a Financial Advisor in the Washington DC Merrill Lynch office. He focuses on total wealth management and provides solutions for multidimensional personal and business finances and planning….

reactor_smoke_G_20110323232127

April 15th, 2011 – GE Hitachi Nuclear Response Team (GE Power & Water) assessment of the existence of a vessel breach on Fukushima U2

From: RST01 Hoc Sent: Friday, April 15, 2011 9:16 PM To: OST01 HOC Subject: FW: GEH Nuclear Response Team Response In reference to Task 4706, the task is complete. The GEH assessment of…

Data Prepared for Commissioner

Data prepared for the Commissioner for the discussion of the presence of plutonium in the spent nuclear fuels

Zhian Li, PhD Sr. Criticality and Shielding Engineer Division of Spent Fuel Storage and Transportation Nuclear Materials Safety and Safeguards Currently: On a rotational Assignment at Division of System Analysis Nuclear Regulatory Research…

Enformable Training injection of reactor spent fuel pool (taken December 07, 2011)

April 29th, 2011 – SFP Risk Assessment Thoughts – Criticality concerns

Don .Helton Division of Risk Analysis NRC Office of Nuclear Regulatory Research Don Helton – SFP Risk Assessment Thoughts – Pages From C142449-02LX-2 Related Articles on Page 2…

Special Measures

April 19th, 2011 – NRC HQ review of Japan regulations for Special Measures – US vs Japanese approaches to protective measures

From:Huffert, Anthony Sent:Tuesday, April 19, 2011 2:56 AM To:Gepford, Heather; Meighan, Sean Subject:Proposal to request HQ review of Japan’s “Special Measures” Attachments:Japan Regs for Special Meaures.pdf Heather and Sean, Attached is the “special…

Lewis, Dois

April 15th, 2011 – Doris and contractor not involved in Fukushima and not in any position to speak as NRC representatives

From: Sheron, Brian To: Gibson, Kathy; Scott, Michael Sent: Fri Apr 15 13:24:57 2011 Subject: FW: Pre-TripDL- Paris 2011.doc See below. I saw on the pre-trip notification it said that “In addition, discussions…

Fukushima Daiichi February 2012 - Reactor 4 SFP

April 6th, 2011 – Study to consider aftershock impact to Unit 4 Spent Fuel Pool

Notification for Job 00018092 – Pages From c142449-02j-2 Potential for Spent Fuel Pool Draindown – Pages From c142449-02g-3 Related Articles on Page 2…

The crippled TEPCO's Fukushima Daiichi nuclear power plant reactor buildings are seen in Fukushima prefecture

April 5th, 2011 – Humans again got us into this and will hopefully get us out

From:Barnes. Valerie To:Correia. Richard; Peters. Sean; Desaulniers. David Coe. Doug Subject:Coordinated HF input on Fukushima Date:Tuesday, April 05, 2011 3:52:05 PM It appears we’re all being asked from various directions to provide input…

Radiation shelter and shielding wall

April 4th, 2011 – From March 19th to April 1st daily deposition recorded at least once in 21 prefectures

NISA press release from April 2, mentioned that water with dose rate of more than 1000 mSv/hr (100 rem/hr) was confirmed by TEPCO at around 3:20 UTC on April 2 inside the cable storage pit…

BWRMark4 Containment_Page_03

March 31, 2011 – Recommend TEPCO utilize the SAMG recommendation to flood all 3 units’ containments.

Task 1: Given the known, or assumed, status of the three units and four pools, what realistic scenarios exist for energetic dispersion of high quantities of radioactive material that would result in mobile…

Fuel Transfer System

March 2011 – NRC INFORMATION NOTICE NO. 88-92: POTENTIAL FOR SPENT FUEL POOL DRAINDOWN

Purpose: This information notice is being provided to alert addressees to potential problems resulting from the failure of the fuel transfer canal door seal. It Is expected that recipients will review the information…

nrcFighting

March 29th, 2011 – 50 Mile Evacuation Zone and Reentry Guidance for Temporary Access – Jaczko accurately reflects NRC decisionmaking process

50 Mile Evacuation Zone and Reentry Guidance for Temporary Access – Pages From C142449-02F-2 Related Articles on Page 2…

Presentation for 3 pm IPC SVTC

March 29th, 2011 – PPT presentation reflecting data from several sources on trending of Fukushima Daiichi dose measurements

From: PMT07 Hoc Sent: Tuesday, March 29, 201112:58 PM To: Zimmerman, Roy Cc: Hoc, PMT12; PMT07 Hoc; FOIA Response.hoc Resource; RST01 Hoc; OST01 HOC; OST02 HOC; Weber, Michael; Blount, Tom; Cool, Donald Subject:…

Status of iron frame construction for the reactor building cover of Unit 1 at Fukushima Daiichi Nuclear Power Station

March 23rd, 2011 – Decommissioning Type Information for Ops Center -Entombment Considerations

From: Scott, Michael Sent: Saturday, March 26, 2011 2:15 AM To: LIA02 Hoc Cc: LIA03 Hoc; Casto, Chuck; Monninger, John; Dorman, Dan Subject: RE: ACTION – Decommissioning,/Type Information for Ops Center I think…

Enformable Incorrect data for pressure at Primary Containment Vessel of Unit 1 decoded_Page_06

March 25th, 2011 – Controlled failure of a nuclear reactor – Scrubbing Fission Product Releases

From:Lee, Richard Sent:- Friday, March 25, 2011 3:48 PM To:’powess@crossnet.org’” Subject:FW: Garwin comments of Science Group call of 03/24. To Binkley list of 03/24. Attachments:ATT00001..gif Another one, From: Sheron, Brian Sent: Friday, March…

The explosion at Reactor 1 did not effect the towers in the same manner

March 25th, 2011 – Fukushima Unit 1 tally of information from different sources

Lee, Richard From: Basu, Sudhamay Sent: Friday, Marchi25, 2011 5:14 PM To: Lee, Richard Subject: Fukushima Unit 1 Richard, Here is a tally of information from different sources.     Sud Tally of…

KI Availability by States

March 23rd, 2011 – All our liquid KI expires by May 2012 – After that we will not carry liquid KI any longer

From: Hoc, PMT12 Sent: Wednesday, March 23, 2011 5:34 PM To: PMT03 Hoc Subject: FW: Hi- From: Milligan, Patricia Sent: Wednesday, March 23, 2011 5:32 PM To: Hoc, PMT12 Subject: FW: Hi- From:…

Diagram of Unit 2 Historical Data

March 22nd, 2011 – New SOW for SNL to perform Fukushima analysis

Task 1: Fukushima Dai-cihi event analysis for station blackout 1.1 Fukushima Dai-ichi Reactor Assessment Perform an evaluation of Fukushima Unit 1 to 4 SBO sequences. These sequences are longterm station blackout sequences with variations…

March 22 and 23, 2012  Survey result map of the change of radioactive materials concentration (Cesium) in the marine soil within 20km of Fukushima Daiichi Nuclear Power Station

March 22nd 2011 – IAEA Request for Analytical Support from NRC for Fukushima source term assessment

  From: LIA02 Hoc Sent: Tuesday, March 22, 2011 2:57 PM To: Hoc, PMT12; PMT03 Hoc Cc: Shaffer, Mark R Subject: FW: Fukushima FYI – the IAEA is requesting our assistance. I’m going…