Fukushima Daini Unit 1 Reactor Building – 6th Floor
December 17, 2011 福島第二原子力発電所site visits (6th floor Unit 1 reactor building) (December 17, 2011 shooting) video is here
6th floor Unit 1 Reactor Building – December 17th, 2011 – Fukushima Daini
December 17, 2011 福島第二原子力発電所site visits (6th floor Unit 1 reactor building) (December 17, 2011 shooting) video is here
Effects of aging at Fukushima Daiichi Reactor 1
December 15, 2011Impact of aging in Fukushima Daiichi Nuclear Power Plant Accident No. 1 reactor in Fukushima Daiichi Nuclear Power Station (1.79MB)
Fukushima Daiichi – Nuclide Analysis of the Accumulated Water Unit 3 and 4
Fukushima Daiichi – Basement of the Turbine Building Result of Nuclide Analysis of the Accumulated Water 10-Dec-11 10:15 AM Accumelated water of the basement of the turbine building of Fukushima Daiichi Unit 3…
Photos of the solid waste storage status at Fukushima Daiichi
Status of the solid waste storage at Fukushima Daiichi Nuclear Power Plant. Storage No.1 (pictured on November 8, 2011) Storage No.2 (pictured on November 8, 2011) Storage No.4 (pictured on November 9, 2011) South side (mountain…
Fukushima Daiichi – Situation of Solid Waste Storage
1.Purpose ・Confirmation of the situation of the radioactive solid waste keeping and the storage building. 2.Object of the survey ・Storage No. 5 – No. 8 which keep solid wastes (drums). 3.Content of the…
Installation of new recirculation lines to Desalination System – Reverse Osmosis Membrane
Dec 13, 2011Installation of new recirculation lines to Desalination System (Reverse Osmosis Membrane) (13.6KB)
Measurement result of radioactivity concentration of water treatment facilities
Dec 12, 2011Measurement result of radioactivity concentration of water treatment facilities (31.6KB)
Fukushima Daiichi – Leakage from Sampling Line of Evaporative Concentration System 3C
Dec 13, 2011Leakage from Sampling Line of Evaporative Concentration System 3 C (39.3KB)
TEPCO Nighttime Training Emergency Security Measures
2011.12.8 <Download> [Reference]Emergency Security Measures “Nighttime Training” Conducted on Dec. 7 (287KB) Training to secure electricity with power source car (pictured on December 7, 2011) Training to inject water into Reactors & Spent…
Water runoff into ocean from evaporation apparatus leaks Fukushima Daiichi
Water runoff on ocean evaporation apparatus leaked Fukushima Daiichi Nuclear Power Station – Reference (28.1KB) Leak (puddle) situation (taken December 04, 2011) Situations where leakage (taken December 04, 2011) TEPCO, the operator of…
Fukushima Daiichi evaporative concentration apparatus, Leakage treatment with sandbags
Fukushima Daiichi Nuclear Power Plant evaporative concentration apparatus, Leakage treatment with sandbags (pictured on December 4, 2011). 2011.12.5 <Download> [Reference]Fukushima Daiichi Nuclear Power Plant evaporative concentration apparatus Status of the water leakage (29.0KB)…
45 tons of contaminated water leaks into sea from Fukushima Daiichi
Source: Yomiuri December 04, 2011 <Draining Water on Underground Floor of Turbine Building (T/B)> ◇Status of highly concentrated accumulated radioactive water treatment facility and storage tank facility [Treatment Facility] ・6/17 20:00 Full…
December 03, 2011- TEPCO Fukushima Dose rate in the building space
December 03, 2011Dose rate in the building space (1.64MB)









