Media
Enformable scene00831

Fukushima Daini Unit 1 Reactor Building – 6th Floor

December 17, 2011 福島第二原子力発電所site visits (6th floor Unit 1 reactor building) (December 17, 2011 shooting) video is here

Enformable scene00136

6th floor Unit 1 Reactor Building – December 17th, 2011 – Fukushima Daini

December 17, 2011 福島第二原子力発電所site visits (6th floor Unit 1 reactor building) (December 17, 2011 shooting) video is here

Enformable handouts_111215_01-j_Page_06

Effects of aging at Fukushima Daiichi Reactor 1

  December 15, 2011Impact of aging in Fukushima Daiichi Nuclear Power Plant Accident No. 1 reactor in Fukushima Daiichi Nuclear Power Station (1.79MB)

Result of Nuclide Analysis of the Accumulated Water

Fukushima Daiichi – Nuclide Analysis of the Accumulated Water Unit 3 and 4

Fukushima Daiichi – Basement of the Turbine Building Result of Nuclide Analysis of the Accumulated Water 10-Dec-11 10:15 AM Accumelated water of the basement of the turbine building of Fukushima Daiichi Unit 3…

Enformable 1st basement of storage No. 6

Photos of the solid waste storage status at Fukushima Daiichi

Status of the solid waste storage at Fukushima Daiichi Nuclear Power Plant. Storage No.1 (pictured on November 8, 2011) Storage No.2 (pictured on November 8, 2011) Storage No.4 (pictured on November 9, 2011) South side (mountain…

Enformable handouts_111214_02-e_Page_01

Fukushima Daiichi – Situation of Solid Waste Storage

1.Purpose ・Confirmation of the situation of the radioactive solid waste keeping and the storage building. 2.Object of the survey ・Storage No. 5 – No. 8 which keep solid wastes (drums). 3.Content of the…

Fukushima - Daiichi - Enformable scene00424

Remains of Upper Floors at Fukushima Daiichi Reactor 3 – IAEA Video

Fukushima - Daiichi - Enformable scene00322

Fukushima Daiichi Reactor 3 – IAEA Video

Installation of new recirculation lines to Desalination System - Reverse Osmosis Membrane

Installation of new recirculation lines to Desalination System – Reverse Osmosis Membrane

Dec 13, 2011Installation of new recirculation lines to Desalination System (Reverse Osmosis Membrane) (13.6KB)

Measurement result of radioactivity concentration of water treatment facilities

Measurement result of radioactivity concentration of water treatment facilities

Dec 12, 2011Measurement result of radioactivity concentration of water treatment facilities (31.6KB)  

Enformable Leakage from Sampling Line of Evaporative

Fukushima Daiichi – Leakage from Sampling Line of Evaporative Concentration System 3C

  Dec 13, 2011Leakage from Sampling Line of Evaporative Concentration System 3 C (39.3KB)  

Japan journalist concerned about mutated vampire dogs attacking humans after Fukushima

Enformable Training by establishing car supply reserve power (taken December 07, 2011)

TEPCO Nighttime Training Emergency Security Measures

2011.12.8 <Download> [Reference]Emergency Security Measures “Nighttime Training” Conducted on Dec. 7 (287KB) Training to secure electricity with power source car  (pictured on December 7, 2011) Training to inject water into Reactors & Spent…

Enformable Leak (puddle) situation (taken December 04, 2011) copy

Water runoff into ocean from evaporation apparatus leaks Fukushima Daiichi

Water runoff on ocean evaporation apparatus leaked Fukushima Daiichi Nuclear Power Station – Reference (28.1KB)  Leak (puddle) situation (taken December 04, 2011) Situations where leakage (taken December 04, 2011) TEPCO, the operator of…

Fukushima Daiichi Nuclear Power Plant evaporative concentration apparatus, Leakage treatment with sandbags December 4th, 2011

Fukushima Daiichi evaporative concentration apparatus, Leakage treatment with sandbags

Fukushima Daiichi Nuclear Power Plant evaporative concentration apparatus, Leakage treatment with sandbags (pictured on December 4, 2011). 2011.12.5 <Download> [Reference]Fukushima Daiichi Nuclear Power Plant evaporative concentration apparatus Status of the water leakage (29.0KB)…

UnEncrypted_Page_02

Fukushima Daiichi Concentration of Radioactivity around Fukushima Daiichi

Leakage from evaporation device status - References

45 tons of contaminated water leaks into sea from Fukushima Daiichi

  Source: Yomiuri December 04, 2011 <Draining Water on Underground Floor of Turbine Building (T/B)> ◇Status of highly concentrated accumulated radioactive water treatment facility and storage tank facility [Treatment Facility] ・6/17 20:00 Full…

Enformable TEPCO Dose Data Enformable_Page_28

December 03, 2011- TEPCO Fukushima Dose rate in the building space

December 03, 2011Dose rate in the building space (1.64MB)

Nighttime Event at Fukushima Daiichi Reactor 3

Dec 1: Fukushima Webcam Shows Possible Fire at Reactor

Filmed at 10am ET

Enformable © 2014 All Rights Reserved