Photos
Access Hatch

TEPCO sends robot into Fukushima Daiichi Reactor 2 Torus Room – Finds high radiation levels but no signs of leaks

TEPCO released photos of two manhole covers in the Torus room of Fukushima Daiichi Reactor 2. The robot was sent to inspect the catwalk near the inspection manholes attempting to locate any signs…

Countermeasures against expansion of leakage at Fukushima Daiichi

Countermeasures against expansion of leakage at Fukushima Daiichi

Reactor 2 PCV 10

TEPCO Endoscope Inspection of Fukushima Daiichi Reactor 2

scene10103

Worker investigation of Torus Room of Fukushima Daiichi Reactor 2

2012.3.16 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS (2) Unit2 NW (1) (pictured on March 14, 2012) Unit2 NW (2) (pictured on March 14, 2012) Unit2 NW (3) (pictured on…

Survive Nuclear Holocaust

Newly released infographic explains mitigation actions to surviving a nuclear holocaust

Embed this infographic on your site! <a href=”http://www.besthealthdegrees.com/survive-nuclear/”><img src=”http://www.besthealthdegrees.com/survive-nuclear/nuclear-holocaust.jpg” alt=”Survive a Nuclear Holocaust” width=”500″  border=”0″ /></a><br />From: <a href=”http://www.besthealthdegrees.com”>BestHealthDegrees.com</a> From: BestHealthDegrees.com How To Survive A Nuclear Holocaust Last year, nuclear meltdowns and multiple…

Fukushima Transcripts

NRC Operational Center Fukushima Day 1 Transcripts Audio Clips

NRC Operational Center Fukushima Day 1 Audio Clips – March 11, 2011 Pages 76, 78, 86, 96, 106, 255, 206-266 Blog: http://public-blog.nrc-gateway.gov/2012/02/21/transcripts-provide-unique-glim… Transcripts: http://www.nrc.gov/reading-rm/foia/japan-foia-info.html

OLYMPUS DIGITAL CAMERA

The bottom of the sea in the water intake open channel – Fukushima Daiichi

TEPCO detected relatively high concentrated radioactive materials from marine soil sampled at inside of the port. Since the marine soil will be spread by ocean currents, the utility plans to prevent spreading of marine pollution to…

Temperature measuring points in the Reactor 2 RPV at #Fukushima Daiichi

Temperature measuring points in the Reactor 2 RPV at #Fukushima Daiichi

Reactor 4 at Fukushima Daiichi 

scene00021

TEPCO Releases Videos Inside of Fukushima Daiichi Reactor 4 Spent Fuel Pool

2012.2.10 <Download> Investigation into the transparency of the spent fuel pool of Unit 4 (28.3KB) Videos *Video File For Download Investigation into the transparency of the spent fuel pool of Unit 4 (10.1MB)…

Crack

Fukushima hoses facing difficulties as chigaya grass is perforating lines

February 9, 2012 For events related to corruption investigation into the cause of pressure hose [Reference] (943KB) Crack Penetration of (Imperata cylindrica) plant Torsion test Tensile test Implementation status of the tensile test…

Water Leakage from Temporary Tank at east side of Unit 2 T B (Temporary Tank at east side of Unit 2 T B)

Water Leakage from Temporary Tank at east side of Unit 2 T/B (Temporary Tank at east side of Unit 2 T/B)

2012.2.8 <Download> Water Leakage from Temporary Tank at east side of Unit 2 T/B(Temporary Tank at east side of Unit 2 T/B) (135KB) Temporary Tank at east side of Unit 2 T/B (pictured…

Leakage from water desalinations(RO)concentrated water

Leak at Fukushima Daiichi over 2,000 mSv/hr at bottom of water storage tank

TEPCO has found polluted water leaking from  concentrated salt water storage tank for the purification of contaminated water of the Fukushima Daiichi nuclear station and announced that high beta radiation levels were detected over…

Enformable 1

Dose Reduction Debris Removal at Fukushima Daiichi

2012.2.3 <Download> [Reference]Radiation dose reduction by collecting dust and small rubbles at the parking lot in front of Main Anti-Earthquake Building of Fukushima Daiichi Nuclear Power Station (344KB) Removing surface soil etc.(1) (pictured…

Reactor 4 Wall Support

Removed upper wall and truss sections from Fukushima Daiichi Reactor 4

Reactor 4 Roof Debris

30 Collected Images of Fukushima Daiichi Reactor 3 and 4 Debris Removal Operations

Water Leakage observed around the flowmeter of Emergency Reactor Injection Pump (C)

Fukushima – Water Leakage observed around the flowmeter of Emergency Reactor Injection Pump (C)

2012.2.1 <Download> [Reference]Water Leakage observed around the flowmeter of Emergency Reactor Injection Pump (C) on the Hill at Fukushima Daiichi Nuclear Power Station  Drainage at the side of the reactor injection facility on…

Status of Water Leakage on the 1st floor of Fukushima Daiichi Reactor 4

Status of Water Leakage on the 1st floor of Fukushima Daiichi Reactor 4

2012.2.1 <Download> [Reference] Status of Water Leakage on the 1st floor of Unit 4 Reactor Building, Fukushima Daiichi Nuclear Power Station (Test line of the Piping for Jet Pump Measurement) Rack for Jet…

Installation of the cover

TEPCO reveals new measures against freezing of water treatment facilities

2012.2.1 <Download> [Reference]Measures against Freeze of Water Treatment Facility / Measures against Freeze of Reactor Water Injection System at Fukushima Daiichi Nuclear Power Station (185KB) the Cover (emergency of reactor water injection pump…

FD 170

Photos of workers applying grounds treatment materials around Fukushima Daiichi

Enformable © 2012 All Rights Reserved