FOIA’s Related to Reactor 3
NRC Transcripts – Fukushima Reactor 3 Spent Fuel Pool crack and possible loss of inventory
Reactor 3 core nearly completely uncovered by March 12th – GE confirmed reference level TAF
March 13th, 2011 – JNES Communications – Reactor 2 fuel uncovered – Reactor 3 explosion
March 14th, 2011 – NRC ONLY Update – All 3 Reactor cores likely damaged
March 14th – Unit 3 Containment broken – radiation released – Tokyo levels increased twentyfold
March 15th, 2011 – The Whole Spent Fuel Pool At Reactor 3 Could Boil Dry In 20 Days
March 16th, 2011 – Fukushima Units 1,2,3 have fuel damage – Lost secondary containment integrity
March 17th, 2011 – JSDF helicopter crews report dose rates of 375 R/hr 300 ft above Reactor 3
March 18th, 2011 – Corroborating reports that either Unit 3 Reactor or SFP may be dry?
March 23rd, 2011 – Suspect 3 ft of salt in bottom of reactor vessel – SFP lasted 3 days
March 23rd, 2011 – Smoke from Reactor 3 May Be Nuclear Heat From Undesired Criticality
March 29th, 2011 – Status of 3 Units and 4 pools – Realistic Scenarios
March 30th, 2011 – Events at Fukushima Units 1-4
April 25th, 2011 -Unit 3 100% Leak rate – Updating Source Term – MELCOR analysis