Unit 5 High pressure turbine (Turbine building 2F) (pictured on Aug 23, 2011)

Author: No Comments Share:
Previous Article

Unit 5 Boric acid injection pump (A)(Reactor building 4F) (pictured on Aug 19, 2011)

Next Article

Unit 5 Moisture separator drain pipe support(Turbine building B1F) (pictured on Aug 23, 2011)