Fukushima – Water Leakage observed around the flowmeter of Emergency Reactor Injection Pump (C)

Author: No Comments Share:

2012.2.1

Mixing point of the montain-side drainage near the assembly (pictured on January 29, 2012)
Mixing point of the montain-side drainage near the assembly (pictured on January 31, 2012)
Mixing point of the facility-side drainage near the assembly ditch (pictured on January 31, 2012)
Aassembly ditch of the drainage (pictured on January 31, 2012)
Drainage at the side of the reactor injection facility on the hill (2) (pictured on January 29, 2012)
Drainage at the side of the reactor injection facility on the hill (1) (pictured on January 29, 2012)

 